B-1 and B-3 Test Stands

The High Energy Rocket Engine Research Facility (B-1) and Nuclear Rocket Dynamics and Control Facility (B-3) were vertical test stands with cryogenic fuel and steam ejector systems that permitted rocket fuel systems to be studied in simulated altitude conditions. Each test stand had several levels, a test section, and ground floor shop areas. The test stands relied on an array of support buildings to conduct their tests, including a control building, steam exhaust system, and fuel storage and pumping facilities.

Documents

  • B Complex layout
  • B Complex Property Details (2009)
  • B-1 and B-3 Historic Engineering Report (2010)

B–1 Stand—High Energy Rocket Engine Research Facility

The B–1 Stand was designed for hot-firing tests of hydrogen and fluorine engines with up to 30,000 pounds of thrust at altitude conditions, although it was never used in this capacity. It had a vacuum capsule for testing entire engines in a space environment, and a steel test carriage for cold-flow tests. Researchers never utilized its engine firing capability, but they did test full-scale hydrogen pumping systems for simulated missions.

Physical Description: B–1 was located with the Nuclear Rocket Dynamics and Control Facility (the B–3 Stand) off of Box Factory Road near the southern end of the Rocket Systems Area. The 135-foot-tall vertical tower was enclosed above the 68-foot level. By 1964 the facility included roll-up doors on three sides to provide ventilation in the event of a hydrogen leak. The B–1 tower faced two rectangle retention ponds to the southwest. The steam accumulators and a steam ejector stack were linked to the southeast wall of the test stand. A rectangular single-story Pump House and a smaller Valve House stood between the test stand and the large retention ponds. A water tower was to the west of the ponds. The B–1 Stand included cryogenic fuel tanks, exhaust gas scrubbers, and large storage trailers for gaseous and cryogenic materials.

The test chamber was a 13-foot-diameter, 30-foot-tall space within the tower. The B–1 Stand included cryogenic fuel tanks, exhaust gas scrubbers, and large storage trailers for gaseous and cryogenic materials. A two-stage steam ejector provided vacuum pumping to create the low pressures of space. The facility was tied into Plum Brook Station’s [today, the Neil Armstrong Test Facility] data acquisition system.

Operation: It took two days for the Boiler House to fill the steam accumulators needed to operate the two-stage steam ejector that provided vacuum pumping to create the low pressures of space. During this period the staff installed the instrumentation, purged and chilled the propellant lines, and sequenced the run program equipment. When this was complete, the operator initiated the steam ejector system. Once the exhaust duct pressure reached 2 pounds per square inch, the operator commenced the test run, which usually lasted under 1 minute. The tests were run from the B Control Building located approximately 2,500 feet from the facilities. The facility was tied into the station’s data acquisition system in H Control.

Tests: The B–1 Stand was used for extensive study of the Mark IX turbopump for the Kiwi phase of the

Nuclear Engine for Rocket Vehicle Application (NERVA) program. The B–1 tests focused on the propellant feed system, including the turbopumps, fluid instability in flow passages, and evaluation of equipment performance. Researchers also used the B–1 Stand for a series of liquid hydrogen outflow and tank-pressurization tests for the Centaur Program. The tests led to a redesign of the tank insulation that was eventually the standard used on the Centaur D, and they were an important early step in the eventual elimination of the boost pumps from the Centaur feed system.

  • 1964–66 NERVA engine propellant feed tests
  • 1967–69 Advanced Centaur tests

Documents

  • B-1 Floor Plans and Description
  • B-1 Facility Resume (1960s)
  • B-1 Historic Engineering Report Description
  • B-1 NERVA Apparatus Description (1964)
  • B1 Stand Status Reports (1963-71)
  • B-1 End Condition Statement (1973)

B–3 Stand—Nuclear Rocket Dynamics and Control Facility

The B–3 Stand was used to study tanking and flow systems for complete nuclear rocket engine systems in simulated altitude conditions. The rocket’s combustion chamber was pressurized to simulate an actual launch, but the engines were not fired and the reactor was not operated. The B–1 Stand facilitated the study of propellant flow systems and turbopumps.

Physical Description: The B–3 Stand was located with the B–1 Stand off of Box Factory Road near the southern end of the Rocket Systems Area. At 210 feet in height, the 50- by 50-foot tower was the tallest structure at Plum Brook. The upper section, 32 by 27.5 feet in area, was enclosed above the 74-foot level. The first floor contained a shop area, mechanical equipment room, tool crib, manifold purge control room, and instrumentation rooms. The shop and mechanical equipment room were adjacent to the east side of the test stand. The forward instrument room was adjacent to the north side of the test stand.

Operation: The operations of the B–3 Stand were similar to those of the B–1 Stand. It took two days for the Boiler House to fill the steam accumulators needed to operate the two-stage steam ejector that provided vacuum pumping to create the low pressures of space. During this period the staff installed the instrumentation, purged and chilled the propellant lines, and sequenced the run program equipment. When this was complete, the operator initiated the steam ejector system. Once the exhaust duct pressure reached 2 pounds per square inch, the operator commenced the test run, which usually lasted under 1 minute. The tests were run from B Control located approximately 2,500 feet from the facilities. The facility was tied into the data acquisition system in H Control.

Tests: Researchers used the B–3 Stand for two extended test programs: the startup of the propellant flow system for the Kiwi-B nuclear engine and jettison tests of the CSS for the new Titan-Centaur vehicle. The B–3 tests established the proper startup procedure, which included liquid-hydrogen flow rates, power-cycle time delay, and the powering of the turbine. The B–3 Stand conducted a number of tests of the CSS for the new Titan-Centaur vehicle. Unlike previous B–1 or B–3 studies, these tests focused on the protective shroud, not the turbopumps. Unlatch tests verified that the CSS would jettison in a cold space environment, structural load tests determined the structural integrity of the CSS in a cold environment, and insulation tests led to a redesign of the insulation system.

  • 1966 Kiwi-B engine propellant feed tests
  • 1972–74 CSS jettison and tanking tests

Documents

  • B-3 Floor Plans and Description
  • B-3 Nuclear Rocket Flow Facility (1969)
  • B-3 Stand Description (1974)
  • B3 Stand Status Reports (1965-74)
  • B-3 Historic Engineering Report Description
  • B-3 Facility Resume (1960s)
Provide feedback

民权资讯网专业的单位网站制作开发写给马宝宝起名哈尔滨建材聂姓男宝宝起名用天字起的名字网站优化 外包贵州制作网站培训悲伤逆流成河电视剧东莞学习seo世界上最早种植水稻网站设计答辩ppt模板北京严查户口违规生辰八字免费在线起名打分周易算命免费预测2019运程读后感的格式神马seo新媒体营销的推广方法喜爱夜蒲陈柏宇发型广场舞起名什么名好招牌名字怎么起猪年给女孩子起名大全为戴茜小姐开车seo诊断报告书八字测起名吉凶女宝宝起名带沫取名起名于什么洲喜剧之王1电影姓氏曲起名字男孩小宝的起名关于创业的议论文少年生前被连续抽血16次?多部门介入两大学生合买彩票中奖一人不认账让美丽中国“从细节出发”淀粉肠小王子日销售额涨超10倍高中生被打伤下体休学 邯郸通报单亲妈妈陷入热恋 14岁儿子报警何赛飞追着代拍打雅江山火三名扑火人员牺牲系谣言张家界的山上“长”满了韩国人?男孩8年未见母亲被告知被遗忘中国拥有亿元资产的家庭达13.3万户19岁小伙救下5人后溺亡 多方发声315晚会后胖东来又人满为患了张立群任西安交通大学校长“重生之我在北大当嫡校长”男子被猫抓伤后确诊“猫抓病”测试车高速逃费 小米:已补缴周杰伦一审败诉网易网友洛杉矶偶遇贾玲今日春分倪萍分享减重40斤方法七年后宇文玥被薅头发捞上岸许家印被限制高消费萧美琴窜访捷克 外交部回应联合利华开始重组专访95后高颜值猪保姆胖东来员工每周单休无小长假男子被流浪猫绊倒 投喂者赔24万小米汽车超级工厂正式揭幕黑马情侣提车了西双版纳热带植物园回应蜉蝣大爆发当地回应沈阳致3死车祸车主疑毒驾恒大被罚41.75亿到底怎么缴妈妈回应孩子在校撞护栏坠楼外国人感慨凌晨的中国很安全杨倩无缘巴黎奥运校方回应护栏损坏小学生课间坠楼房客欠租失踪 房东直发愁专家建议不必谈骨泥色变王树国卸任西安交大校长 师生送别手机成瘾是影响睡眠质量重要因素国产伟哥去年销售近13亿阿根廷将发行1万与2万面值的纸币兔狲“狲大娘”因病死亡遭遇山火的松茸之乡“开封王婆”爆火:促成四五十对奥巴马现身唐宁街 黑色着装引猜测考生莫言也上北大硕士复试名单了德国打算提及普京时仅用姓名天水麻辣烫把捣辣椒大爷累坏了